EVSE (EV Charger) Installation & Safety Handover

Preview

This is a preview. Nothing you enter here is saved or sent.

Section 1 of 8: Site & Installation Info

Site & Installation Info

Note on Usage

This handover record is based on DOE Alternative Fuels Data Center EVSE installation guidance and the requirements codified in NEC Article 625 (EV charging). Completing it does not guarantee code compliance and does not replace the authority-having-jurisdiction (AHJ) permit and inspection or any required utility approval. The licensed installer remains responsible for a safe, code-compliant installation.

Licensed electrician or certified EVSE installer performing the work.

Enter the manufacturer and model as printed on the unit's nameplate.

Charging level

Rated output current of the EVSE as listed on the nameplate.

A
Connection method
Outdoor location?

Gates the weatherproof-enclosure check. Select Yes for any unit exposed to weather.

Commercial / public installation?

Gates impact-protection and accessibility checks that apply to commercial and public sites.

Installed on a shared / load-managed circuit?

Gates the load-management / CT verification check. Select Yes when the EVSE shares a circuit or uses load sharing.