Weekly Facility Perimeter & Access Control Walkthrough

Run this Weekly Facility Perimeter & Access Control Walkthrough from your phone — online or offline — and get a finished PDF report when you're done.

Free tier, no card Works fully offline PDF report on completion
7
Inspection areas
40
Checkpoints · Pass / Fail / N·A
6critical
High-severity flags
Yes
Photo & signature support
security-operations
Based on

Overview

What is a Weekly Facility Perimeter and Access Control Walkthrough?

A perimeter and access-control walkthrough is the deeper security sweep that typical daily opening and closing checks don't cover. It covers walking the fence line and building envelope, verifying every keypad and badge reader, confirming that terminated employees' credentials are actually deactivated, checking that cameras are recording, and verifying that emergency exits still open freely from the inside and can't be used to slip back in from outside. Most of this reflects general physical-security practice, informed at the concept level by the Cybersecurity and Infrastructure Security Agency's (CISA) small-business and facility-security guidance, not a binding regulation. The exit-door check is different: it enforces an actual legal requirement. The Occupational Safety and Health Administration's (OSHA) exit-route rules, 29 CFR 1910.36 and 1910.37, require exit doors to open from inside without a key, tool, or special knowledge at all times. A facilities or site security manager typically runs the walkthrough weekly; an insurer, landlord, or corporate security team is often the one who asks for it.

This template runs 40 checkpoints across 7 sections: a walkthrough-details section; the site perimeter, building envelope, access control, and surveillance sections; the emergency egress and life-safety section; and a findings-and-sign-off section. It opens with a required usage note citing the CISA and OSHA basis described above. 6 items are flagged critical: a perimeter breach, an exterior door that won't lock, active credentials for someone no longer employed, exits that aren't openable from the inside or are obstructed, and an exit door that can be entered from outside. A Fail on any one forces a Security Deficiency verdict no matter what the rest of the site scores. It's built for a facilities or security manager to run weekly in 15 to 25 minutes, and it's the deeper counterpart to the daily gm-daily-opening-security-log and store-closing-security-log, which spot-check security rather than audit the whole site.

The checklist

Every checkpoint, in full

A read-only preview of the live template. Clone it to run the inspection on mobile, where each item records Pass, Fail or N·A with optional photos and notes.

PassFailN·A
01

Walkthrough Details

4 checks

NOTENote on Usage

Based on general physical-security practice (incl. CISA guidance) and, for the egress checks, OSHA exit-route rules (29 CFR 1910.36/.37). Completing it does not guarantee the facility is secure or compliant with OSHA, fire, or building codes; the operator remains responsible for correcting all security and life-safety deficiencies and meeting applicable codes and insurer requirements. Emergency exits must be operable at all times — never chained, padlocked, or blocked.

Facility / location name

Text

Date

Date

Conducted by

Text

Areas / buildings covered

What this walkthrough covered — perimeter, which buildings, docks, annexes.

Text
02

Site Perimeter

7 checks

Perimeter fencing, walls, and gates intact — no breaches or gapsCritical

A hole in the fence, a climbable gap, or a gate that won't latch is an open entry point.

PassFailN·A

Gates and vehicle barriers close, latch, and lock

PassFailN·A

Exterior / perimeter lighting all functioning

Dark zones invite intrusion and are a trip hazard. Note every fixture out.

PassFailN·A

Security / no-trespassing signage posted and legible

PassFailN·A

Landscaping and sightlines clear of entrances, windows, and cameras

PassFailN·A

Yard, dumpster, and outdoor storage areas secured

PassFailN·A

Photo — site perimeter

Photo
03

Building Envelope & Doors

5 checks

All exterior doors close, latch, and lock properlyCritical

Any door that doesn't lock is an unsecured opening overnight.

PassFailN·A

Door hardware, hinges, and frames intact — no signs of tampering or pry damage

PassFailN·A

Windows secure; locks and glazing intact

PassFailN·A

Overhead, loading, and delivery doors secured

PassFailN·A

Roof hatches, skylights, and utility / mechanical access secured

Mark N/A for access points your facility doesn't have.

PassFailN·A
04

Access Control Systems

6 checks

Keypads / badge / fob readers functioning at controlled doors

PassFailN·A

Lost, terminated, or expired credentials deactivatedCritical

Active codes, keys, or fobs for former staff are a direct breach. Confirm the access list is current.

PassFailN·A

Key / fob inventory and master keys accounted for

PassFailN·A

Access / entry logs reviewed for anomalies since the last walkthrough

PassFailN·A

Intrusion alarm system tested and functioning

PassFailN·A

Alarm monitoring / central-station connection confirmed

Mark N/A if the facility has no monitored alarm.

PassFailN·A
05

Surveillance (CCTV)

5 checks

All cameras powered and recording

PassFailN·A

Camera views unobstructed and correctly aimed

PassFailN·A

Recorder (DVR / NVR) secure, online, and timestamp correct

PassFailN·A

Recorded footage retained

Confirm retention meets your policy or insurer requirement.

Number (days)

Photo — camera coverage / any blind spot

Photo
06

Emergency Egress & Life Safety

7 checks

Emergency exits open freely from the inside — not chained, padlocked, or blockedCritical

The classic security-vs-safety violation. Exits must open without a key, tool, or special knowledge at all times (OSHA 29 CFR 1910.36/.37).

PassFailN·A

Exit doors don't allow entry from outside — no exterior handle, defeated latch, or unsecured proppingCritical

Panic hardware should only operate from inside. An exit door with exterior pull hardware, a taped or blocked latch, or left propped open is an unlocked entrance, not just an egress path.

PassFailN·A

Exit routes, aisles, and exit doors unobstructedCritical

PassFailN·A

Exit signs illuminated and legible

PassFailN·A

Emergency / egress lighting functional

Test units if equipped with a test button.

PassFailN·A

Panic / exit hardware operates correctly

PassFailN·A

Fire-exit doors not propped open or disabled

PassFailN·A
07

Findings & Sign-off

6 checks

Open deficiencies and corrective actions

List each issue, the corrective action, and the owner / target date.

Text

Additional notes

Text

Photo — any deficiency requiring follow-up

Photo

Conducted by (signature)

Signature

Reviewed with management?

YesNo

Management signature

Signature

Yours to edit

Not quite how your site runs?

Clone it and the checklist becomes yours in seconds. Reword a checkpoint, drop in a whole new section, flag what's critical, and add photo or signature fields wherever proof matters. No code, no form-building. And if you'd rather start clean, build a template from scratch in the same builder.

+ Add a section✎ Reword any check⚑ Flag critical⤓ Photo & signature

Field procedure

How to run this inspection

Walk the site area by area. Mark each checkpoint Pass, Fail or N·A as you go, and add a photo on any Fail to document it for the report.

STEP 01

Walkthrough Details

Check all items in the Walkthrough Details area and record Pass, Fail or N·A for each.

STEP 02

Site Perimeter

Check all items in the Site Perimeter area and record Pass, Fail or N·A for each.

STEP 03

Building Envelope & Doors

Check all items in the Building Envelope & Doors area and record Pass, Fail or N·A for each.

STEP 04

Access Control Systems

Check all items in the Access Control Systems area and record Pass, Fail or N·A for each.

STEP 05

Surveillance (CCTV)

Check all items in the Surveillance (CCTV) area and record Pass, Fail or N·A for each.

STEP 06

Emergency Egress & Life Safety

Security measures must never trap people inside. These checks confirm everyone can still get out in an emergency.

Run your first Weekly Facility Perimeter & Access Control Walkthrough today

Clone the template, inspect from your phone, and hand over a finished PDF report before you leave the floor.