FFIELDSPECTLog inStart free
Free template · public domain source · no account needed to preview

Free inspection template

OSHA 29 CFR 1926ConstructionMobile + PDF

OSHA 1926 Construction Site Compliance Audit

Audit a job site against the construction standards OSHA cites most often, from fall protection and ladders to excavation, cranes, and silica. Activities you do not have on site switch themselves off. Finish with a branded PDF you can share with the site super or the safety committee.

Free tier, no card Works fully offline PDF report on completion
13
Inspection areas
84
Checkpoints · Pass / Fail / N·A
14critical
High-severity flags
Yes
Photo & signature support
OSHA 29 CFR 1926
Based on

Overview

What is an OSHA 1926 construction site walkthrough?

OSHA 29 CFR Part 1926 is the federal occupational safety and health standard for the construction industry. It covers everything from PPE and fall protection to scaffolding, excavation safety, and electrical hazards on job sites. Falls are the leading cause of construction fatalities, accounting for more than one in three construction deaths each year, and fall protection remains OSHA's most frequently cited standard across all industries. A periodic site walkthrough is how safety managers and superintendents catch the issues a compliance officer would flag before an unannounced visit.

This template is a 84-checkpoint audit across 13 sections, built for a safety manager, site superintendent, or competent person. It covers fall protection and fall protection training, ladders and stairways, scaffolding, excavation and trenching, electrical, PPE, hand and power tools, cranes and hoisting, respirable crystalline silica, and site housekeeping. 14 items are flagged critical, so a single failure fails the audit and the PDF names what failed on the cover. Four sections gate themselves on the activity in progress, so a site with no excavation never sees the trenching questions.

The checklist

Every checkpoint, in full

A read-only preview of the live template. Clone it to run the inspection on mobile, where each item records Pass, Fail or N·A with optional photos and notes.

PassFailN·A
01

Audit Scope & Site Information

10 checks

NOTENote on Usage

This audit is based on OSHA construction standards in 29 CFR Part 1926. It is a self-assessment aid, not a legal compliance determination, and completing it does not guarantee OSHA compliance or a hazard-free worksite. The controlling employer and each subcontractor remain responsible for identifying and correcting hazards and for meeting every standard that applies to the work in progress.

Audit date

Date

Project name or site address

Text

Auditor name and title

Text

Controlling contractor on site

Text

Primary phase of work in progress

Sitework and excavationFoundationsStructural framingBuilding envelope+3

Number of workers on site at time of audit

Number

Scaffolding erected or in use on site?

Gates the Scaffolding section.

YesNo

Excavation or trenching in progress?

Gates the Excavation & Trenching section.

YesNo

Cranes, derricks, or hoisting equipment in use?

Gates the Cranes & Hoisting section.

YesNo

Silica-generating tasks performed (cutting, grinding, drilling, or breaking concrete or masonry)?

Gates the Respirable Crystalline Silica section.

YesNo
02

Site Safety Program & Competent Persons

6 checks

Competent persons designated for each applicable activity and known to the crewsCritical

A competent person can identify hazards and has authority to take prompt corrective action.

PassFailN·A

Site-specific safety plan available on site and current for the work in progress

PassFailN·A

Daily or shift safety briefing (toolbox talk) held and documented

PassFailN·A

Frequent and regular site inspections by a competent person documented

PassFailN·A

Workers trained in the hazards of their assigned tasks, with records retained

PassFailN·A

Subcontractor safety requirements communicated and enforced by the controlling contractor

PassFailN·A
03

Fall Protection (§1926.501, §1926.503)

8 checks

Fall protection provided wherever workers are 6 feet or more above a lower levelCritical

PassFailN·A

Unprotected sides and edges guarded by guardrail, safety net, or personal fall arrestCritical

PassFailN·A

Holes and floor openings covered, secured against displacement, and markedCritical

PassFailN·A

Personal fall arrest systems inspected before each use and free of defects

Check webbing for cuts, burns, and chemical damage; check hardware for deformation and corrosion.

PassFailN·A

Anchorages capable of supporting 5,000 pounds per attached worker, or designed by a qualified person

PassFailN·A

Fall protection training provided and certified in writing

The written certification must identify the employee, the training date, and the trainer.

PassFailN·A

Written fall protection plan in place where conventional systems are infeasible

Applies to leading-edge, precast concrete, and residential roofing work. Mark N/A if conventional systems are in use.

PassFailN·A

Photo of fall protection in use at an exposed edge

Photo
04

Ladders & Stairways (§1926.1053, §1926.1051)

6 checks

Stairway or ladder provided at every point of access with a 19-inch or greater break in elevation

PassFailN·A

Portable ladders extend at least 3 feet above the upper landing surface

Where the 3-foot extension is impractical, the ladder must be secured and grab rails provided.

PassFailN·A

Ladders set at a 4-to-1 pitch on stable, level footing and secured against movement

PassFailN·A

Ladders free of structural defects; defective ladders tagged and removed from service

PassFailN·A

Ladders used near energized conductors have nonconductive side rails

PassFailN·A

Stairways with four or more risers, or rising more than 30 inches, fitted with stair rails

PassFailN·A
05

Scaffolding (§1926.451)

7 checks

Scaffold inspected by a competent person before each work shift and after any occurrence that could affect its integrityCritical

PassFailN·A

Fall protection provided for work more than 10 feet above a lower levelCritical

PassFailN·A

Scaffold erected, moved, altered, and dismantled under the supervision of a competent person

PassFailN·A

Platforms fully planked, with planking properly supported and secured against displacement

PassFailN·A

Scaffold and components support at least 4 times the maximum intended load

Suspension ropes and connecting hardware must support 6 times the maximum intended load.

PassFailN·A

Safe access provided; workers do not climb cross braces

PassFailN·A

Photo of the erected scaffold

Photo
06

Excavation & Trenching (§1926.651, §1926.652)

7 checks

Protective system in place for excavations 5 feet or deeper, or a competent-person determination documentedCritical

PassFailN·A

Excavation inspected daily, and after any hazard-increasing occurrence, by a competent personCritical

PassFailN·A

Safe means of egress within 25 feet of lateral travel in trenches 4 feet or deeperCritical

PassFailN·A

Spoil piles, materials, and equipment kept at least 2 feet from the excavation edge

PassFailN·A

Underground installations located before excavating, then protected or supported while open

PassFailN·A

Excavation edges 6 feet or deeper barricaded where the excavation is not readily visible

PassFailN·A

Photo of the excavation and its protective system

Photo
07

Electrical Safety (§1926.404, §1926.405)

6 checks

GFCI protection provided, or a documented assured equipment grounding conductor program in placeCritical

PassFailN·A

Required equipment grounding conductor tests performed and recorded

PassFailN·A

Cords and cables free of damage, with ground pins intact and no improvised splices

PassFailN·A

Temporary lighting protected from breakage and not suspended by its cords

PassFailN·A

Minimum 20 feet of clearance maintained from overhead power lines up to 350 kV

Greater clearance is required above 350 kV. Applies to equipment operation and material handling.

PassFailN·A

Panels, boxes, and fittings closed with no exposed energized parts

PassFailN·A
08

Personal Protective Equipment (§1926.100 – §1926.102)

6 checks

Head protection worn in all areas with overhead, falling-object, or impact exposureCritical

PassFailN·A

Eye and face protection provided and worn for the task hazards present

PassFailN·A

High-visibility apparel worn where vehicle or mobile equipment traffic is present

PassFailN·A

Hearing protection available and used where noise exposure requires it

PassFailN·A

Foot protection appropriate to site conditions and the work performed

PassFailN·A

PPE hazard assessment completed, and PPE inspected and maintained in serviceable condition

PassFailN·A
09

Hand & Power Tools (§1926.300 – §1926.304)

5 checks

Guards in place on all power tools with exposed moving partsCritical

PassFailN·A

Tools inspected regularly and defective tools removed from service

PassFailN·A

Pneumatic tool safety clips or retainers installed, and hoses secured against accidental disconnection

PassFailN·A

Powder-actuated tool operators trained, and tools not used in explosive or flammable atmospheres

PassFailN·A

Circular saw guards present and retracting freely

PassFailN·A
10

Cranes & Hoisting (§1926.1400)

5 checks

Operator certified or qualified for the equipment type and capacity being operatedCritical

PassFailN·A

Shift inspection completed by a competent person before use

PassFailN·A

Annual or comprehensive inspection documentation available on site

PassFailN·A

Rigging inspected before each shift; slings and hardware free of defects

PassFailN·A

Swing radius barricaded and the load path kept clear of workers

PassFailN·A
11

Respirable Crystalline Silica (§1926.1153)

5 checks

Written exposure control plan in place for the silica-generating tasks performedCritical

Must describe the tasks, the engineering controls and work practices used, housekeeping measures, and how access to work areas is restricted.

PassFailN·A

Competent person designated to implement the exposure control plan and make frequent inspections

PassFailN·A

Table 1 engineering controls fully implemented for the task, or an exposure assessment performed

Table 1 controls are typically integrated water delivery or a vacuum dust collection system, plus respiratory protection based on task duration.

PassFailN·A

Dry sweeping and compressed air not used where they contribute to silica exposure

Wet sweeping or HEPA-filtered vacuuming is required unless infeasible.

PassFailN·A

Medical surveillance offered to workers required to wear a respirator 30 or more days per year

PassFailN·A
12

Housekeeping, Fire Protection & Site Control

7 checks

Walkways and work areas free of debris, protruding nails, and trip hazards

PassFailN·A

Scrap and combustible waste removed at regular intervals

PassFailN·A

Fire extinguishers provided and accessible for the hazards present

PassFailN·A

Flammable liquids stored in approved containers away from ignition sources

PassFailN·A

Safety Data Sheets available for chemicals brought on site, and containers labeled

PassFailN·A

Signs, signals, and barricades in place at hazard locations and excavations

PassFailN·A

Potable water and sanitation facilities provided for the size of the crew

PassFailN·A
13

Findings & Sign-off

6 checks

Summary of findings and overall site compliance posture

Text

Items requiring immediate corrective action

Text

Any condition found that warrants stopping work until corrected?

YesNo

Describe the stop-work condition and the action taken

Text

Target date for corrective action review

Date

Auditor signature

Type your full name to attest that this audit reflects the conditions and records observed on the date shown.

Signature

Yours to edit

Every job site is a little different.

Clone the template and open it in the builder. Add a section for hazards specific to your trade, reword checks to match your site conditions, and flag the items that fail as critical. No code, no spreadsheets.

+ Add a section✎ Reword any check⚑ Flag critical⤓ Photo & signature

Field procedure

How to run this inspection

Walk the site systematically in the order the standard groups hazards. Mark each checkpoint PASS, FAIL, or N/A as you go, and capture a short note on anything you fail.

STEP 01

Set the scope

Record the project, the auditor, the controlling contractor, and the phase of work, then answer the four activity questions. Each one gates a whole section: no scaffolding on site means the scaffolding section never appears, on the phone or in the PDF.

STEP 02

Confirm the competent persons

Part 1926 assigns specific duties to a designated competent person for scaffolds, excavations, fall protection, and silica. Confirm who they are and that the crews know. This is among the first things an inspector establishes.

STEP 03

Work the fall and electrocution hazards

Fall protection wherever workers are 6 feet or more above a lower level, ladders extending at least 3 feet above the landing, holes covered and marked, and GFCI protection or a documented assured grounding program on temporary power.

STEP 04

Audit the gated activities

Scaffold inspection before each shift, excavation protective systems at 5 feet and the daily competent-person inspection, crane operator certification, and the written silica exposure control plan. These carry the documentation an inspector asks for by name.

STEP 05

Close with findings and sign-off

Summarize what you found, list what needs immediate correction, and set a review date. If anything warrants stopping work, record the condition and the action you took. Sign, and the branded PDF is ready to send.

FAQ

Common questions

Is this OSHA 1926 template free?+
Yes. The free tier covers 1 user and up to 10 completed inspections per month, including the branded PDF report. No credit card required to start.
Does completing this checklist make my site OSHA compliant?+
No. This template is a self-inspection aid based on 29 CFR Part 1926 construction-industry guidance. The employer remains responsible under the OSH Act for identifying and correcting all hazards on the site. Use the results to drive corrective action, not as proof of compliance.
Can I customize the checkpoints for my trade?+
Yes. Clone the template into your account and open the builder. You can add or remove sections, reword any check to match your work scope, mark items as critical, and add photo or signature fields without writing code.
Does this work offline on a job site?+
Yes. The mobile app runs the inspection locally on your phone (including photos) and syncs everything when you're back online. The PDF generates when the inspection is marked complete.
How often should we run a 1926 site walkthrough?+
Most construction safety programs run a general site walkthrough daily or at the start of each shift, with more formal documented inspections weekly. Match the cadence to the phase of work and the hazard profile on your site.
What does this template not cover?+
This audit covers the construction standards OSHA cites most often, including a gated section for cranes and hoisting. It does not cover demolition, blasting, steel erection, utility and powerline work, confined-space entry permits, or asbestos and lead abatement, and it is not a substitute for a task-specific lift plan or job hazard analysis. Run dedicated templates for those activities when they apply to your project.

Run your next site walkthrough from your phone

Clone the template, walk the site, and mark each checkpoint as you go. When you finish, you'll have a branded PDF report ready to share with the superintendent or file with your safety records.

Descriptive use notice. "OSHA" and "29 CFR 1926" are referenced descriptively to identify the public-domain federal standard this template is based on. FieldSpect is not affiliated with, endorsed by, or certified by the U.S. Occupational Safety and Health Administration. This template is a self-inspection aid and does not guarantee regulatory compliance.