FFIELDSPECTLog inStart free
Free template · public domain source · no account needed to preview

Free inspection template

solar-renewablesInspectionMobile + PDF

Solar O&M Annual Check — Free Template

Run this Solar O&M Annual Check from your phone — online or offline — and get a finished PDF report when you're done.

Free tier, no card Works fully offline PDF report on completion
10
Inspection areas
48
Checkpoints · Pass / Fail / N·A
5critical
High-severity flags
Yes
Photo & signature support
solar-renewables
Based on

Overview

What is A Solar O&M Annual Check?

A Solar O&M Annual Check is a structured checklist that helps inspectors systematically verify compliance with the relevant standards or operational requirements. Completing the inspection on mobile produces a timestamped PDF that can be shared immediately with clients or management.

The checklist

Every checkpoint, in full

A read-only preview of the live template. Clone it to run the inspection on mobile, where each item records Pass, Fail or N·A with optional photos and notes.

PassFailN·A
01

System & Visit Information

8 checks

NOTENote on Usage

This annual health check is based on NREL/DOE photovoltaic O&M best-practice guidance; safety-critical items (e.g., rapid shutdown per NEC 690.12) are referenced by requirement only. Completing it does not replace the manufacturer's required maintenance, electrical-code compliance, or required safety testing, and does not certify the system as safe or code-compliant. The servicing company and system owner remain responsible for safe, code-compliant operation and for correcting identified issues.

Service date

Date

Technician name and certification

Name of the servicing technician; include license or NABCEP certification number if applicable.

Text

Site address

Text

System size (DC)

Nameplate DC capacity of the array.

Number (kW)

Year installed

Number (year)

Inverter type

String inverterMicroinvertersDC optimizers + string inverterCentral inverter+2

Expected annual production reference

Informational: modeled or prior-year annual production for comparison this visit. Leave blank if not available.

Number (kWh)

Battery storage present?

Gates the energy-storage section below.

YesNo
02

Modules & Array

5 checks

Modules clean; soiling within acceptable range or cleaned this visit

Note heavy or uneven soiling (dust, pollen, bird droppings); uneven soiling can cause localized hot spots.

PassFailN·A

Cracked, discolored, or delaminated modules observed?

Look for cell cracks, browning/yellowing, bubbling, or delamination of the laminate or backsheet.

YesNo

Photo of damaged module(s)

Photo

New shading since last visit (tree growth, construction)?

Compare to prior site conditions; note any new obstruction casting shade on the array.

YesNo

Module clamps and mounting fasteners secure

PassFailN·A
03

Thermal Imaging

4 checks

Thermal (infrared) scan performed this visit?

Infrared imaging detects hot spots, inactive cells, bypass-diode failures, and loose connections.

YesNo

Thermal hot spots or anomalies found?

A hot spot is a module or cell running notably hotter than its neighbors.

YesNo

Maximum anomaly temperature rise above ambient

Action threshold: investigate any hot spot more than 20 °C above the surrounding module temperature. Confirm against the camera and module manufacturer guidance.

Number (°C)

Photo of thermal anomaly

Photo
04

Racking & Structural

5 checks

Racking intact; no significant corrosion

PassFailN·A

Fastener torque spot-check within specification

Re-torque to the manufacturer's specification; note any backed-out or missing hardware.

PassFailN·A

Roof penetrations and flashing sealed and watertight

Roof-mount systems: confirm sealant is intact and not degrading.

PassFailN·A

Ground-mount footings and posts stable (if applicable)

PassFailN·A

Conduit and cable management secured and supported

Confirm conduit straps, cable clips, and wire management are intact; no conductors resting on the roof or in standing water.

PassFailN·A
05

Electrical (DC & AC)

7 checks

Combiner box(es) inspected; connections tight, no moisture intrusion

Open and inspect combiners; re-torque terminal connections to specification, report broken terminal blocks.

PassFailN·A

DC connectors (e.g., MC4) intact; no burning or meltingCritical

PassFailN·A

Conductor insulation sound; no cracking, chafing, or UV damageCritical

PassFailN·A

DC and AC disconnects operate freely (not jammed)

PassFailN·A

Grounding and bonding connections intactCritical

PassFailN·A

Signs of arcing, scorching, or overheating found?Critical

Look for discoloration, soot, melted insulation, or a burnt odor at terminations, connectors, and enclosures.

YesNo

Photo of arcing or scorching

Photo
06

Inverter

6 checks

No active fault or error codes on the inverter

PassFailN·A

Fault or error codes recorded (if any)

Capture any displayed or logged codes verbatim; leave blank if none.

Text

Display and communications operational

PassFailN·A

Cooling fans, vents, and heat sinks clear of dust and debris

Clean vents and heat sinks per the manufacturer's warranty requirements.

PassFailN·A

Inverter firmware current (updated if required)

PassFailN·A

Inverter AC output verified

Record measured AC output at the time of the visit (informational; compare to expected for the conditions).

Number (kW)
07

Production & Monitoring

4 checks

Underperforming or mismatched string(s) flagged?

Compare per-string current or zone-level production; flag any string reading low versus its peers.

YesNo

Underperforming string detail

Identify the affected string(s) and the suspected cause (shading, soiling, connector, module).

Text

Production vs. expected

Performance this period as a percentage of expected. Action threshold: investigate if below 90%.

Number (%)

Monitoring portal online and reporting correctly

PassFailN·A
08

Energy Storage

4 checks

Battery state of health

From the battery management system if available. Action threshold: investigate if below 80% of rated capacity.

Number (%)

No active battery fault or alarm codes

PassFailN·A

Enclosure ventilation and clearances unobstructed

Confirm airflow and required clearances; keep open flames and ignition sources away from the battery.

PassFailN·A

Battery terminals clean and tight; no corrosion

PassFailN·A
09

Safety & Labeling

2 checks

Rapid shutdown function operates correctlyCritical

Verify the rapid-shutdown initiator de-energizes the array as required (NEC 690.12).

PassFailN·A

Required labels, placards, and signage present and legible

Confirm rapid-shutdown, disconnect, and warning labels are intact and readable.

PassFailN·A
10

Recommendations & Sign-off

3 checks

Work performed and recommendations

Text

Next service due

Date

Technician signature

Signature

Yours to edit

Not quite how your site runs?

Clone it and the checklist becomes yours in seconds. Reword a checkpoint, drop in a whole new section, flag what's critical, and add photo or signature fields wherever proof matters. No code, no form-building.

+ Add a section✎ Reword any check⚑ Flag critical⤓ Photo & signature

Field procedure

How to run this inspection

Walk the site area by area. Mark each checkpoint Pass, Fail or N·A as you go, and add a photo on any Fail to document it for the report.

STEP 01

System & Visit Information

Check all items in the System & Visit Information area and record Pass, Fail or N·A for each.

STEP 02

Modules & Array

Check all items in the Modules & Array area and record Pass, Fail or N·A for each.

STEP 03

Thermal Imaging

Check all items in the Thermal Imaging area and record Pass, Fail or N·A for each.

STEP 04

Racking & Structural

Check all items in the Racking & Structural area and record Pass, Fail or N·A for each.

STEP 05

Electrical (DC & AC)

Check all items in the Electrical (DC & AC) area and record Pass, Fail or N·A for each.

STEP 06

Inverter

Check all items in the Inverter area and record Pass, Fail or N·A for each.

Run your first Solar O&M Annual Check today

Clone the template, inspect from your phone, and hand over a finished PDF report before you leave the floor.