FFIELDSPECTLog inStart free
Free template · public domain source · no account needed to preview

Free inspection template

food-serviceInspectionMobile + PDF

Weekly HACCP Audit — Free Template

Run this Weekly HACCP Audit from your phone — online or offline — and get a finished PDF report when you're done.

Free tier, no card Works fully offline PDF report on completion
13
Inspection areas
60
Checkpoints · Pass / Fail / N·A
17critical
High-severity flags
Yes
Photo & signature support
food-service
Based on

Overview

What is A Weekly HACCP Audit?

A Weekly HACCP Audit is a structured checklist that helps inspectors systematically verify compliance with the relevant standards or operational requirements. Completing the inspection on mobile produces a timestamped PDF that can be shared immediately with clients or management.

The checklist

Every checkpoint, in full

A read-only preview of the live template. Clone it to run the inspection on mobile, where each item records Pass, Fail or N·A with optional photos and notes.

PassFailN·A
01

Audit Information

8 checks

NOTENote on Usage

This audit is based on HACCP principles and the FDA Food Code. It does not replace your facility's written HACCP plan or guarantee regulatory compliance; the operator remains responsible for validating critical limits and corrective actions for their specific process.

Week ending (date)

Saturday end-of-day is conventional; use whatever your plan defines.

Date

Auditor (HACCP team leader or food safety manager)

Text

HACCP plan version / revision date on file

Text

Cooking step identified as a CCP in this plan?

YesNo

Cooling step identified as a CCP in this plan?

YesNo

Receiving step identified as a CCP in this plan?

YesNo

Allergen control program in place?

Yes if you handle any of the FDA major 9 allergens (milk, egg, fish, shellfish, tree nut, peanut, wheat, soy, sesame).

YesNo

ATP swab / surface microbial testing used as a verification activity?

YesNo
02

HACCP Plan Currency (Principles 1–3)

4 checks

HACCP plan reviewed within the last 12 months (or after any material process change)?Critical

PassFailN·A

Process flow diagram on file matches the actual production flow?

Walk the line mentally. If a new step was added (e.g., a vacuum-tumbler, a new SKU), the flow diagram must reflect it.

PassFailN·A

Hazard analysis covers all biological, chemical, and physical hazards for current product mix?

PassFailN·A

Each identified CCP has a written critical limit, monitoring procedure, and corrective-action plan?

PassFailN·A
03

CCP — Cooking (Principles 4–5)

5 checks

Cook-temp log present and complete for every production shift this week?Critical

A missing log is treated as a deviation under §8-201.

PassFailN·A

All logged cook temperatures met or exceeded the critical limit for the product?Critical

PassFailN·A

Any cook-temp deviations recorded this week?

YesNo

Each deviation has a documented corrective action and verification?Critical

PassFailN·A

Briefly summarize deviations + corrective actions

Text
04

CCP — Cooling (Principles 4–5)

5 checks

Cooling log present and complete for every batch cooled this week?Critical

PassFailN·A

All cooled batches met the 2-hour 135→70°F and 6-hour 135→41°F critical limits?Critical

PassFailN·A

Any cooling deviations this week (slow cool, missed checkpoint, abandoned batch)?

YesNo

Each cooling deviation has a documented corrective action (re-heat, discard, or process change)?Critical

PassFailN·A

Describe cooling deviations + corrective actions

Text
05

CCP — Hot / Cold Holding (Principles 4–5)

6 checks

Hot-hold log present and complete every day this week?Critical

PassFailN·A

All hot-hold readings ≥135°F across sampled logs?Critical

PassFailN·A

Cold-hold log present and complete every day this week?Critical

PassFailN·A

All cold-hold readings ≤41°F across sampled logs?Critical

PassFailN·A

Any hot/cold hold deviation this week?

YesNo

Each hold-temp deviation has documented corrective action (discard, re-heat, repair)?Critical

PassFailN·A
06

CCP — Receiving (Principles 4–5)

5 checks

Receiving log present and complete for every delivery this week?

PassFailN·A

Receiving temperatures within critical limit for every TCS load (typically ≤41°F)?Critical

PassFailN·A

Letters of guarantee / supplier statements current and on file for relevant suppliers?

PassFailN·A

Any loads rejected or returned this week?

YesNo

Describe rejected loads (vendor, product, reason)

Text
07

Allergen Control Program

5 checks

Dedicated tools / color-coded prep equipment in use for allergen-containing items?

PassFailN·A

Documented cleaning between allergen and non-allergen prep (validation log if pre-shift changeovers)?

PassFailN·A

Ingredient labels and recipe cards reflect current allergen content (no unlabeled new SKUs)?Critical

PassFailN·A

Any allergen cross-contact incidents (suspected or confirmed) this week?

YesNo

Each incident has root-cause analysis + corrective action documented?Critical

PassFailN·A
08

Equipment Calibration & Verification (Principle 6)

4 checks

Probe thermometer(s) calibrated this week (ice slurry 32°F or boiling 212°F at sea level)?Critical

PassFailN·A

Sanitizer test strips on hand and not expired?

PassFailN·A

Sanitizer concentration verified within label range (quat 200 ppm, chlorine 50–100 ppm, iodine 12.5–25 ppm)?

PassFailN·A

Cold-hold equipment thermometers (built-in or supplemental) reading accurately?

PassFailN·A
09

Training Currency

5 checks

At least one Certified Food Protection Manager on site during every operating hour this week?Critical

PassFailN·A

All current food handlers have valid food handler card / training certificate on file?

PassFailN·A

Allergen-awareness training current for all food handlers (where required by state)?

PassFailN·A

Any certifications expiring in the next 30 days?

YesNo

List employees + certifications expiring soon (initials + cert + expiration date)

Text
10

Sanitation Verification

5 checks

Cleaning schedule logs complete for all defined zones this week?

PassFailN·A

ATP swab results within action limit on tested surfaces?

PassFailN·A

Any visible sanitation failures observed during this audit (not in routine cleaning rotation)?

YesNo

Describe sanitation failure(s) and immediate remediation

Text

Photo of remediated area (if sanitation failure was found)

Photo
11

Corrective Actions Log Review (Principle 5)

3 checks

All corrective actions from prior weeks closed or assigned with target date?

PassFailN·A

Trending issue identified (same CCP failing repeatedly, same vendor rejected, etc.)?

YesNo

Describe the trending issue and the plan to address (process change, retraining, supplier change)

Text
12

Verification Activities (Principle 6)

3 checks

At least one direct observation of a food handler performing a CCP this week (cook, cool, hold)?

PassFailN·A

End-product or environmental sampling completed per the plan's schedule (if applicable)?

PassFailN·A

All HACCP records for this week filed in the designated location and legible?

PassFailN·A
13

Auditor Sign-off

2 checks

Overall summary + recommendations for next week

Text

Auditor signature (typed full name)

Signature

Yours to edit

Not quite how your site runs?

Clone it and the checklist becomes yours in seconds. Reword a checkpoint, drop in a whole new section, flag what's critical, and add photo or signature fields wherever proof matters. No code, no form-building.

+ Add a section✎ Reword any check⚑ Flag critical⤓ Photo & signature

Field procedure

How to run this inspection

Walk the site area by area. Mark each checkpoint Pass, Fail or N·A as you go, and add a photo on any Fail to document it for the report.

STEP 01

Audit Information

Identify the audit week and which CCPs the facility's HACCP plan applies to. The presence checks here drive the gated CCP sections below.

STEP 02

HACCP Plan Currency (Principles 1–3)

The plan itself must remain current with the operation. Confirm the plan reflects today's products, processes, and equipment.

STEP 03

CCP — Cooking (Principles 4–5)

Review the prior week's cooking-temperature logs. Sample at least one log per shift per day if multi-shift; one log per day if single shift.

STEP 04

CCP — Cooling (Principles 4–5)

Cooling logs must show TCS food cooled 135°F → 70°F within 2 hours and 135°F → 41°F within 6 hours total. Review every cooling log from the prior week.

STEP 05

CCP — Hot / Cold Holding (Principles 4–5)

Hot holding ≥135°F; cold holding ≤41°F. Sample at least 2 holding logs per day from this week.

STEP 06

CCP — Receiving (Principles 4–5)

If receiving is a CCP for your operation (incoming product condition / supplier-provided documentation), audit the receiving log and any supplier-quality records from this week.

Run your first Weekly HACCP Audit today

Clone the template, inspect from your phone, and hand over a finished PDF report before you leave the floor.