Skip to content
FFIELDSPECT™Log inStart free

Back to the template page

PV System Commissioning & Quality Audit

Preview

This is a preview. Nothing you enter here is saved or sent.

Section 1 of 10: System & Site Information

System & Site Information

Note on Usage

Based on NREL/DOE PV commissioning best practice and the requirements of NEC Article 690 (solar PV) and Article 705 (interconnected sources). Completing it does not guarantee code compliance and does not replace the AHJ inspection or the utility witness test required for permission to operate (PTO). The licensed installing contractor remains responsible for a safe, code-compliant installation and for correcting all deficiencies before the system is energized.

Name and electrical license / certification number of the agent performing this audit.

Total array nameplate DC power.

kW DC

Combined inverter continuous AC output rating.

kW AC

e.g. manufacturer, model, and total module count.

Include microinverter / optimizer count if applicable.

Inverter architecture
Mounting / racking type

We use optional analytics cookies and session recordings to improve FieldSpect. Accept to allow them, or decline and we'll only count visits anonymously. Privacy Policy